We ship (almost) every Wednesday
October 23rd, 2026
- AI Form Builder with Conditional Logic and Repeating Groups: Describe the form you need and LaunchBay’s AI builds it with follow-up questions that only appear when they apply, plus repeating groups with an “Add another” button named for each entry, like “Add another team member.” Learn more →
- Tasks That Mark Themselves Complete: Contract tasks now complete when the last signer finishes, and file upload and proof tasks ask clients “Mark it complete?” once everything is done, so projects keep moving without a missed click. Learn more →
- Keep Completed Projects in the Client Portal: Choose project by project to keep a completed project visible to clients, so they can come back for final files and signed documents. Learn more →
- Portal invite emails now use the right wording for password-protected portals.
- Client portals without LaunchBay branding no longer show a “formerly” reference to our previous name.
- The “Create a New Template” button now says Create Template instead of Create Project.
October 21st, 2026
- PHP Vulnerability Patched: A security advisory was announced for PHP, the programming language behind parts of our infrastructure. We applied the patch on 10/21/26, immediately after its release and promptly addressed the vulnerabilities. We have found no sign of unauthorized access to our systems. No action is needed on your part, and there was no downtime or change to LaunchBay.
October 20th, 2026
- Catch Up on Projects with Your AI Assistant: Ask Claude, ChatGPT, or any assistant connected to the LaunchBay MCP what’s happened on a project, and it summarizes the latest task updates, comments, file uploads, form submissions, and client touchpoints like portal logins. Learn more →
- Project Tag Automation Trigger: Use project tags being added or removed as automation triggers to activate tasks conditionally, import stages from other templates based on scope or client needs, and more. Pair them with the HubSpot and Zapier integrations to apply tags when projects are created, and tailor every project to each customer’s needs with no manual work required. Learn more →
- Saved Filters in Projects: Apply any of your saved task filters inside a project’s Tasks tab, without rebuilding them by hand.
Learn more → - More Task Filters in Projects: Project task views now have the same Quick Filters as All Tasks (Your Tasks, Recent Comments, Overdue, and Due Soon), plus an Unassigned option in the Assignees filter. Learn more →
- Broken Automation Warnings: Automations that point to a deleted task, stage, form field, portal page, meeting, or tag now show a yellow warning naming what’s missing, so you can fix them before a project stalls. Learn more →
- Archived tasks in templates can now be unarchived from the task’s three-dot menu. This applies to tasks that stay archived when you create a template from a project or import tasks into a template.
- Video proofs now have a maximum height, so vertical videos like reels display in full in the proof viewer instead of overflowing the screen.
October 15th, 2026
- Reorder Stages and Tasks from Your AI Assistant: Ask your AI assistant to reorder stages, move tasks between stages, or put urgent work first, and the LaunchBay MCP updates your project and client portal in one step. Learn more →
- Client Portal Revamp: We’ve made 12 improvements to client portals. The portal’s Home page now surfaces what needs attention first, overdue tasks and anything due in the next 7 days, with clearer navigation and a better phone experience throughout. Learn more →
- Client Portal Forms Redesign: Forms now use your brand color, larger tap-friendly answer tiles, progress tracking on longer forms, and clearer error messages. Existing forms update automatically. Learn more →
October 12th, 2026
- Durations Reporting: The Durations tab shows how long your completed projects actually took, from kickoff to finish. See average, fastest, and longest project times, your on-time rate, a month-by-month trend, and a stage-by-stage breakdown of where time goes, filterable by template, owner, and time range. Learn more →
- Add or Remove Tags with Automations: Automations can now add or remove task tags on their own. Pair an “Add task tag” or “Remove task tag” action with any trigger you already use to assign teammates, flag blockers, or kick off other automations without anyone clicking. Learn more →
- Project Icon Colors Revamp: Project icons now come in 30 colors, up from 17. The 13 new colors are deep shades chosen to stay distinct for people with color blindness, each paired with a high-contrast icon that meets WCAG AA. Learn more →
- Auto-add client files to folders: Each file you collect in a File Upload task can now save straight to a folder you choose. When a customer uploads it, the file lands exactly where your team needs it, nested subfolders included, no sorting after the fact.
Learn more →
October 7th, 2026
- Build LaunchBay Automations Using AI: Describe an automation in plain English, and your connected AI assistant builds it: "When the client finishes the intake form, start the kickoff stage and email me." It can also show you what's running, edit existing automations, or clean up ones you no longer need. Learn more →
- Create and Edit Project Templates with AI: Paste a document, spreadsheet, or screenshot and your AI assistant builds a complete template, tasks, stages, and forms included. Already have a template? Ask Claude, ChatGPT, or any MCP-enabled tool to add or edit tasks, add or rename stages, or clean up what you don't need. Learn more →
October 5th, 2026
- Duplicate Contracts: Clone any contract in a few clicks. Field placements, signer roles, and settings all carry over. Learn more →
- Customize Your Task Reminder Schedule: Choose from 7 intervals for automated task nudges, set once in team settings. Learn more →
- Client Portal Welcome Message: On the portal home, clients now get a personalized intro, what's waiting on them, and quick links to get around. Learn more →
October 2nd, 2026
- New MCP Connectors for Grok, Viktor, and Cursor: LaunchBay's MCP connector now works with Grok, Viktor, and Cursor, alongside Claude, ChatGPT, and Gemini. Manage projects, tasks, and customers by chatting with your AI tool of choice, no extra tab required. Learn more →
- Show Draft Tasks in the Client Portal: Customers can now see upcoming tasks before work begins. Turn on "Show draft tasks in client portal" in project settings, and any draft-status task appears with a Draft tag, visible but not yet actionable. Learn more →
September 23rd, 2026
- Filter Tasks by Unassigned: Filter the All Tasks view by unassigned users to quickly surface tasks that still need an owner.
- Client portal: fixed project names getting cut off unexpectedly on the All Tasks page on mobile, now truncating cleanly.
- Client portal: the "task submitted" confirmation now stays visible longer after a customer completes a portal form.
- Zapier: fixed optional attendee and project ID validation in the meeting recap zap, to more reliably ensure meeting recaps generated from transcripts sent to LaunchBay by other tools save correctly.
- In the "File Upload" task option, added the ability to restrict file collection uploads to .zip files only.
- Improved duplication of tasks (in a template, import, and everywhere else), so that archived tasks you duplicate now stay archived instead of being reset to "draft," as happens when duplicating an in-progress or completed task.
- Fixed "undefined" occasionally showing up in automation lists (this can still appear if the original resource has since been deleted).
- Fixed an issue preventing the Uncategorized stage from being renamed.
- Improved the responsiveness of the task dependencies modal when a task has many parallel dependencies.
September 17th, 2026
- Task Composer Update: The field previously described as "due in days after activation" is now labeled "duration" throughout the app.
- AI Task Builder Update: Faster and higher-quality task generation at both the project and stage level.
- The Client Portal now shows an "In review" badge when a task is in review by the team.
- LaunchAI agent jobs that hit a rate limit now retry automatically instead of failing.
September 9th, 2026
- Redesigned forms library: The forms listing now has pagination, a clearer stats table, and easier access to the AI form builder, making it faster to find and manage your forms.
- Search forms when attaching to tasks: You can now search your forms library directly from the task attachment flow instead of scrolling to find the right form.
- Bulk move files: Files can now be moved to a different folder in bulk, instead of one at a time.
- Fixed a permissions error that occurred when team admins with all-project access opened tasks in a project they weren't a member of.
- Fixed an issue where empty stage automations didn't show the correct empty state in stage settings.
- Improved backend performance to reduce the chances of LaunchAI Chat timing out.
September 3rd, 2026
- Automations UX Overhaul: Automations got a full redesign, with new filters, an updated interface, and a new History tab so you can see exactly what ran and when.
- Bulk Actions in Templates: Select multiple tasks inside a template to set due dates and reminders, assignees, or tags, or delete them, all at once.
- Skip Weekends for Due Dates: Turn on "skip weekends" to keep due date calculations and automation run delays from landing on a Saturday or Sunday.
- Full Timezone & Daylight Saving Support: All activity timestamps (comments, file uploads, and other "this happened at a time" events) now display in your browser's local timezone instead of your team's timezone. We also now fully support Daylight Saving Time.
- Fixed the import task modal so tasks list in the same order as the task listing.
- The activity badge in the Client Portal now clears as soon as the activity page is viewed.
- "Today" is now highlighted in the meetings calendar for quicker visibility.
- Client Portal page links now appear visually as links.
- Simplified the styling for editing Client Portal pages.
- Fixed an issue with the primary client listing in the Companies People table.
August 26th, 2026
- New Task Options in MCP: Task creation through MCP now supports additional options available in LaunchBay's task composer. Add proofs, embed third party tools, enable a signature requirement, or turn on automated customer reminders, all when creating a task via MCP.
- Update Tasks via MCP: Beyond creating new tasks, you can now update any part of an existing task through MCP, including the title, description, assignees, and any of its configured task options.
- Read Meetings with MCP: List meetings within a date range or pull the full details of a specific meeting via MCP. For completed meetings, this includes retrieving transcripts and summaries in bulk.
- Retrieve Forms via MCP: Pull a list of forms via MCP to find the right one to attach to a task, or retrieve form responses, including answers to individual fields and attached files, in bulk instead of one at a time.
- Simplified the columns on the Projects Dashboard. Completed date now shows only for completed projects, and target end date shows only for active ones.
- Draft messages created in the Message Center no longer prevent the task modal from closing.
- Fixed an issue where the delete button on the files sidebar was occasionally unresponsive.
- Fixed an erroneous permission error some team members would occasionally see on the project page.
- Contracts now support up to 16 signing roles, up from 8.
- Added validation for bulk project CSV imports, so it's always clear when a CSV has uploaded correctly.
August 19th, 2026
- Redesigned LaunchAI experience with a new All Agents inbox: View insights from every agent in one chronological timeline, or select a single agent for its own timeline. Agents are no longer tucked at the bottom of the page, and you can see agent information, timelines, and LaunchAI Chat together without scrolling.
- Saved filters for the All Tasks page: Create saved filters on the All Tasks page, the same way you already can on the Projects Dashboard. Set one as your default and it loads automatically every time you log in and open All Tasks.
- You can now filter the All Tasks page by project tags, in addition to task tags
- You can now rename saved filters on both the All Tasks page and Projects Dashboard
- Fixed an issue where some file downloads occasionally saved without the correct file extension
August 5th, 2026
- Native Calendly Integration: Connect your team's Calendly calendars directly to LaunchBay. Customers book real, available time in their portal; meetings stay in sync automatically; and transcripts turn into follow-up tasks after every call. Available to all Standard and Premium Plan subscribers. Learn more →
- Added a tooltip showing the exact date and time on proofing annotation comments and activity date entries.
- Reorganized team member profile pages into three tabs, Profile, Security, and Integrations, each scoped to its own type of setting.
- Guests no longer see activity on tasks they aren't assigned to.
July 29th, 2026
- File upload task improvements: When creating tasks that use the Upload Files option, specify the exact file type and dimensions you need for each file collection.
- Project notes in MCP: Beyond creating and updating notes through MCP, you can now pull the full version of a project's notes.
- LaunchBay's Zapier integration now gives the create meeting and update meeting actions separate controls for sharing the meeting summary and the transcript to the client portal. Share one, both, or neither.
July 22nd, 2026
- Project Roles: Assign a placeholder role, like Account Manager or Primary Contact, to tasks in a template. Map real people to those roles when you create the project, and every task tied to that role gets assigned automatically. Learn more →
- Task Dependencies: Configure a task, or group of tasks, that must be completed before other tasks can activate. Chain dependencies together to build a waterfall sequence, and use the new dependency map to see the full chain at a glance. Learn more →
- New MCP capabilities: Attach a form to a task as part of creating it, attach a file to a task by URL, and retrieve files uploaded to tasks, both direct uploads and files from form submissions, as URLs.
- You can now set "due in days after activation" for tasks in regular projects, not just templates.
- Clients now only receive comment notifications for tasks they're assigned to. Mentions in a comment thread still go out to clients added to the project, regardless of assignee status.
- When portal passwords are enabled, we no longer send clients a temporary password. Instead, we send a password reset link so they can set their own.
- In LaunchAI Chat, Shift + Enter now adds a new line to the chat box without submitting the query.
July 15th, 2026
- Major MCP update: New capabilities include listing templates and creating new projects from them, adding users to a project, archiving tasks, updating tags on tasks and projects, showing assignee names by default in task listings, creating or updating project notes, and building forms.
- File uploads in task comments: Team members and clients can now upload files directly as part of task comments. This is especially impactful for clients, who can upload files, like screenshots related to a task, right in the comment thread itself, without leaving the context of the task or needing to use the chat area, the Files page, or a separate file upload task in their portal.
- Our latest round of MCP performance improvements make responses faster: we paginated results, added limits to avoid excessive tool calls, and added support for requesting multiple projects or tasks in a single call.
- We've made MCP results in chats smarter and more productive for you and your time by automatically excluding archived or completed projects by default, along with tasks from those projects, unless you specifically request them.
July 8th, 2026
- New MCP capabilities: Three abilities have been added to the MCP Connector, available through LaunchAI Chat and connected AI assistants like Claude and ChatGPT. Retrieve customer form submission data, pull project health scores, and surface decisions captured by the Decisions AI Agent.
- Direct links in MCP responses: When LaunchAI Chat or your connected AI assistant returns information about a task or project, it now includes a direct link back into LaunchBay.
- All Meetings view: The Meetings tab in your admin sidebar now shows all upcoming, scheduled, and yet-to-be-scheduled meetings across every project you're a member of in one place.
- Follow-up tasks for meetings: Meetings now include a dedicated section for follow-up tasks, separate from tasks attached to agenda items. Actions that come out of a call get added directly to the project's tasks page and client portal, with full context of what was discussed.
- Task reminder emails no longer go out to customers who have already completed their work. This applies to contract tasks and tasks with an assignee order.
- Improved handling of LaunchAI Chat responses for more consistent behavior.
July 1st, 2026
- Require MFA for Your Team and Clients: Admins can now require multi-factor authentication for team members, clients, or both.
- New "Needs Attention" Notification Type: A new notification category surfaces the updates that need your immediate action: task assignments, @mentions, contract signatures required, and change requests.
- New Zapier Action – "Create Project Note": You can now create project notes automatically via Zapier.
- Fixed an issue where the scheduled date and time of a meeting wasn't being validated correctly, which could result in incorrect status options and defaults.
- Tasks are no longer automatically marked complete when proofs are approved.
- Clients can no longer mark tasks complete from the portal unless they are assigned to that task, preventing unintended completions by the wrong person.
June 25th, 2026
- LaunchAI: AI chat and AI agents that watch every project, surface what needs attention, and keep customer onboarding and implementation launches on track. Available to all Premium Plan subscribers. Learn more →
- AI Nudges: Use AI to draft a follow-up email with a magic link to the customer's portal, so they can take action without logging in. Available in AI chat, AI agents, and the LaunchBay MCP.
- Notification Improvements: We've reworked notifications to keep team and customer inboxes from getting cluttered. Notification batching is now the default across the entire app: real-time emails are grouped and sent every couple of minutes, so multiple events in a short window (task assignments, new comments, and so on) arrive as a single email. For team members, daily digests have also been consolidated, with one email per day covering activity across all your projects instead of a separate digest for each one.
- The "All Tasks" view now includes a "Client" column to surface the person or company associated with each task.
- Fixed a server error when exporting forms with a field group to CSV, for more reliable, consistent exports of form data.
June 10th, 2026
- Clients Can Now Create Tasks: Clients can now submit requests directly from the Tasks page of their portal, without needing an embedded form. Enable "Allow Client Requests" from any stage's settings dropdown to let clients create requests using a simplified task builder. Admins can choose which team member requests get assigned to, and optionally hide a stage from the project progress tracker. Learn more →
- Improved Project Creation Flow: The project creation modal is now a multi-step flow that lets you add clients, team members, field values, tags, a description, and a due date all at once, without leaving the flow.
- Administrators viewing a project they aren't a member of (when "Read Only" is displayed) can now join it in a single click using the new "Join Project" button, without needing to navigate to the users page.
June 4th, 2026
- Default Project Filters: Highly requested by users, you can now set a default filter on the projects dashboard that applies automatically every time you visit. No more reapplying your filter after navigating away and back.
- New MCP Functionality: Building on our initial MCP Connector release, we've added two new user-requested capabilities. You can now create project stages directly from AI chat, eliminating the need to create stages manually in LaunchBay. You can also assign due dates to tasks, whether those are existing tasks in LaunchBay or new ones you're creating via AI chat.
- The projects dashboard received a UI/UX refresh with improved usability and a cleaner layout structure.
- Fixed the appearance of portal pages containing embedded images.
- Fixed excess padding above client request forms on portal pages.
May 28th, 2026
- LaunchBay MCP Connector: Connect AI assistants like Claude and ChatGPT directly to your LaunchBay account. From any chat, your AI can find projects, check task statuses, create work, send client reminders, and more. Available in early access for all Premium subscribers. Learn more.
- Meetings 2.0: A full overhaul of one of our most-used features. Clients can now view scheduled meetings in their portals. On the admin side, your team gets a calendar view to manage all meetings, agenda items that automatically convert into tasks, internal notes and transcript logging, and automations that trigger next steps when a meeting wraps up. Learn more.
- New Zapier Actions for Meetings: Two new actions make it easier to keep LaunchBay in sync with tools like Calendly and HubSpot. Schedule Meeting creates an upcoming meeting in LaunchBay from any trigger. Save Meeting Recap logs a transcript or summary as a completed meeting record.
- Reordering a portal task inside a private stage no longer shows an erroneous error message.
May 20th, 2026
- Banner Announcements for Client Portals: You can now set a universal, team-wide banner announcement across all client portals, perfect for communicating holiday hours, support information, product or service updates, and more. Available on all standard and premium plans.
- The "Done" stage is no longer automatically added to the project progress tracker, a highly requested change for teams running ongoing or non-sequential projects.
- When using the "Form Submitted" Zapier trigger, you can now map file URLs from client form submissions to downstream actions. For example, send a file uploaded in a form directly to Google Drive using the "Upload File" action.
May 13th, 2026
- In-App Referral Program: You can now sign up for LaunchBay's referral program directly from your account, grab your unique referral link, and track your referrals — all without leaving the app. Earn $200 for every customer you refer. Learn more.
- A direct link to Stripe Payment Methods is now included in invoicing settings, making it easier to configure accepted payment methods like credit card and ACH.
- When a form task is in review and an admin attempts to edit it, a clearer error message now appears prompting them to submit the task or save progress before making changes.
- When dragging and dropping files into the "proofs" or "files" options in the task builder, all uploads now complete before the upload dialog closes.
- Fixed a broken delete option in the CRM clients list.
May 6th, 2026
- Revamped Notes & Meetings: Notes and meetings got a full UI refresh with a cleaner, more organized layout. You can now search across all your notes and meeting records so finding what you need doesn't mean scrolling forever.
- Project Tag Automation: You can now add and remove project tags as an automation action, making it easy to keep projects organized without doing it by hand every time.
- You can now enter a company website without typing https:// at the start.
- Invoice tasks can no longer be marked complete until the invoice has been paid.
- Fixed the button color on the password reset page to avoid conflicts with dark brand colors.
- Teams can now clear a selected Slack channel to choose a new one.
- Improved performance on the project files page for projects with a large number of files.
April 29th, 2026
- Upgrades to Project Reporting: The project reporting interface has been overhauled with a sticky project name column, a new CSV export option, and a toggle between a granular task-level view and a higher-level stages view.
- Overhauled Client Directory (CRM): We refreshed both the People and Companies tabs to surface the information you need faster, including recent activity, last portal login, and more. When viewing a person or company, you now also have dedicated tabs to see all invoices and forms across every project associated with that contact.
- Enhancements to Portal Banners: Custom portal banners are now fully mobile responsive, so your portals look sharp on any device. We've also added a library of ready-to-use banner templates to help you set up branded, customized portals faster.
- Improved Project Navigation: We've improved navigation history within individual projects so you can more quickly jump back to work you've been doing across tabs.
- Rebuilt the new user onboarding flow from start to finish to help new users get up and running with the LaunchBay platform faster.
- Redesigned the login, register, and billing portals for a cleaner, more consistent experience.
- To avoid confusion, draft task assignments no longer appear in the portal activity feed. Only active and completed assignments are shown.
- Fixed the non-functional "hide details" option in the client portal when there are no details to hide.
April 15th, 2026
- Improved Contract Editor: We've redesigned the contract template editor to make setting up new contracts faster, easier, and more flexible. You can now map contract fields to auto-populate project fields directly from a dropdown (no more copy-pasting) and reuse project fields multiple times without editing an ID. Note: the new editor is currently available for new contract templates only.
- Custom Favicons: Accounts on plans that include full white-label functionality can now set a custom favicon for client portals via the Branding Tab in account settings. One more way to deliver a seamless, on-brand portal experience.
- Proof Approval Status in Task Builder: After sending tasks with proofs attached, you can now view the approval status of those proofs directly in the task builder, whether they're awaiting client review, have change requests, or have been approved.
- Redesigned Task Filters: The filters on both the All Tasks page and the Tasks page within individual projects have been redesigned to match the updated filter sidebar on the Projects Dashboard released in a previous update.
- Client portal mobile view enhancements: Fixed several mobile formatting issues in client portals, including the profile badge layout and the activity badge, which now correctly navigates to the activity page on mobile rather than opening the sidebar.
- On hold projects now sorted last in client portal: To prevent confusion when clients access projects marked as On Hold, these projects now appear last in both the Home view and Sidebar of the client portal.
- Stage import for templates is back: Based on user feedback, you can once again import a stage from an existing template when setting up a new one.
- "Target date" renamed to "due date" for stage due dates: Stage due dates are now labeled "due date" for clarity. We've also improved how due dates work in templates, ensuring the "due in days" setting properly applies to child template stages and no longer pulls from the calculated due date of the parent stage.
- New clients now appear in the LaunchBay Directory immediately: Fixed an issue where newly created clients wouldn't show up in the clients table until the page was refreshed.
- Slack integration fix: Fixed pagination of Slack channels when setting up LaunchBay's Slack integration, so all available channels load correctly and can be selected for stage notifications.
- "Assign client to all tasks" now respects existing assignees: When using the option to assign a client to all tasks in a project, clients are now only auto-assigned to portal tasks that don't already have an assignee.
April 9th, 2026
- Native Slack Integration: You can now integrate LaunchBay directly with Slack. Connect your Slack workspace to receive notifications when project stages are completed, delivered to a channel you specify. Read the full setup guide to learn more.
- Add Project Files Directly to Tasks: When attaching a file or proof to a task, you can now import a file that's already been uploaded to your project, eliminating the need to reupload. This is especially useful in scenarios where, for example, a team member uploads a deliverable as part of a separate, private task and you want to attach it to a public task for the client to review and approve in their portal.
- Target Completion Dates for Stages: To give clients and team members more visibility into when key milestones will be completed, you can now set a target completion date for any stage. Read the "Target Completion Date" section of this Knowledge Base article to learn more.
- Hide Project Stages: To give you more control over what clients see in their portal and allow for more flexible internal collaboration within projects, you can now hide project stages by clicking the "More" dropdown on any stage and selecting the "Make Private" option.
- Time Tracking Stopwatch: Instead of always having to log time manually after a task is complete, the new time tracking stopwatch lets your team click into a task and select "Start Stopwatch" to track time as they work, without having to navigate away. Stay focused, stay accurate, and work even more directly in LaunchBay.
- File Thumbnails in Activity Feeds: Project and task activity feeds now display a thumbnail preview for files uploaded by clients and team members, making it easier to spot attachments at a glance.
- For new projects, the Tasks tab now defaults to the first tab in the client portal.
- Fixed an issue where filtering projects by client wasn't working correctly when clicking "View All Projects" from a client profile.
April 1st, 2026
- Task Links in Email Notifications: We now include links to individual tasks in notification emails that reference multiple tasks. This lets your clients click directly into a specific task from their email.
- Portal Page Management: To give you more granular control over what clients can access within their portal, we've moved the management of global portal pages (Files, Messages, Tasks) out of account-wide settings. You can now configure each page as viewable or not viewable within individual projects and templates from the "Portal" page.
- To streamline custom field management, we've moved custom fields into the "Settings" page within projects and templates.
- For tasks and stages that serve as triggers or actions in automations, we now prompt you to confirm deletion to avoid breaking your automations.
- We now show a warning when setting a task's due date in an automation if that task already has one assigned, to avoid confusion over which due date takes priority.
- When using the "Create Task" or "Edit Task" Zapier actions, we now only send a portal invite if the assigned user isn't already on the project. Previously, a portal invite was sent every time those actions fired, even if the user was already a project member.
- Improved the empty state when your team has no contract templates and you go to add a contract to a task.
March 26th, 2026
- Native HubSpot Integration: Connect LaunchBay directly to HubSpot and use the "Create Project" action within your HubSpot workflows. Automatically kick off projects in LaunchBay based on HubSpot triggers. No Zapier Required. Click here for detailed setup instructions.
- Project Template Folders: As part of a complete redesign of the Templates page, you can now create custom folders and organize project templates by your team's naming conventions or processes.
- Creating a project from a template now copies the icon and icon color from the template.
- Resolved an issue for teams with full white-label where digest emails were sent from a different address than the custom sending domain specified.
- Fixed some instances where you could create a project without an owner.
March 18th, 2026
- Saved Filters: In the projects dashboard, you can now create and save custom filters, named however you'd like, so you and your team can quickly re-apply your most important views each time you log in.
- Improved Filter Sidebar: The filter sidebar has been completely redesigned with a refreshed UI and expanded options for building more precise filter criteria.
- Unassigned Task Notifications: To help ensure important tasks don't get overlooked, the admin backend now displays an "active task(s) with no assignee" notification on any stage where unassigned tasks exist.
- Specify Stages When Creating Tasks with Zapier: For Zapier workflows that automatically create tasks in LaunchBay projects, the "Create Task" action now allows you to specify which stage that task will be added to each time your workflow is triggered.
- Fixed an issue where reopening a task due to change requests did not properly display the "Incomplete" status.
- To prevent conflicts with contracts that have already been sent, editing assignees on activated contracts is no longer permitted. To update assignees, remove the existing contract from the task and create or attach a new one.
- When logging out of the client portal, users are now correctly redirected to the appropriate login page based on whether they signed in via magic link or username and password.
- Fixed an issue where zooming in on large PDFs prevented users from scrolling all the way to the left.
March 11th, 2026
- Redesigned progress tracker with stage icons: Icons are now automatically added to the project progress tracker. AI determines the icon based on each stage's name, giving clients a more visual, personalized experience in their portal.
- Redesigned task listing: Updated UI for a more modern look and feel, both in client portals and on the admin side in projects and templates.
- Revamped tag interface with more colors: Project tags and task tags now support a wider range of colors for better customizability and a more personalized experience.
- Tooltips in the activity feed: Hovering over a timestamp in the task activity feed now shows the full date and time. Available in both admin views and the client-facing activity feed in portals.
- Smarter contract role assignment: Clients are now automatically assigned to the "Client" contract role when creating projects from templates or via automated project creation (e.g., triggered from a CRM). Other custom role names are not auto-assigned.
- The "Last Login At" column in the client directory now updates correctly when a user logs in via magic link.
- Task assignment emails are once again sent when a user is added to an already-active task, so new assignees get proper notification.
- For teams using DMY date format: contract date fields now parse correctly in DMY format.
- In the client directory, clicking on a different client while a sidebar is open no longer briefly shows stale data from the previous client.
- Fixed incorrect role auto-assignment when adding a contract to a task that contains non-client roles.
- Fixed proof exports to provide more reliable exports of client comments and annotations.
- Fixed an issue where timezone conversion could adjust a due date to the wrong day when set via Zapier.
March 5th, 2026
- After hearing feedback from users who had a chance to experience our redesigned client portals, our team acted fast to deploy this update outside of our typical Wednesday release schedule. While there are no new features in this release, it includes meaningful improvements and fixes based directly on that feedback.
- The Project Home view in the client portal now only displays a client's uncompleted tasks instead of all tasks.
- Tasks in the client portal are now sorted by due date, then project, then created date.
- The activity sidebar in the client portal now starts closed by default, with a badge showing new activity count.
- Fixed a formatting error with file data being sent in client portal chats.
- When forms contain invalid fields, tasks are now properly prevented from being completed.
- Fixed a glitch where clicking the comment privacy button caused the comment box to hide itself.
March 4th, 2026
- New & Improved Client Portals: We've completely redesigned client portals to feel like a true extension of your brand at every touchpoint, while making sure clients always know what to do and where projects stand. In addition to flowing your brand through to nearly every button, progress indicator, and more, we've also refreshed the UI/UX of key pages including the Home, Tasks, Messages, and Files pages.
- Recurring tasks are no longer spawned for projects that are archived.
- When opening the task modal in the "All Tasks" view, a link to the associated project is now displayed.
February 18th, 2026
- Project Owner Task Assignment: You can now auto-assign the project owner on creation of a new project for both public and private tasks.
- When creating a project via Zapier with multiple clients and "Assign Clients" enabled, all clients are now properly assigned to all public tasks.
- When importing projects from CSV, clients are no longer inadvertently added to template projects.
- When clients upload files to the portal outside of tasks, files are now automatically marked as "shared" and visible to other clients (excluding guest clients).
- Fixed an issue where active stage filters were not displaying properly.
- When duplicating a template, the "read only" badge no longer appears incorrectly.
- Fixed an issue where the notifications search bar would disappear unexpectedly.
February 11th, 2026
- Assignee Order for Tasks: You can now define the order in which assignees must complete a task. Add multiple clients, team members, or both to the same task and specify who completes it first, second, third, and so on to ensure the right person completes the right step at the right time.
- Improved proofing annotations for multi-page PDFs to ensure pinned comments always appear on the correct page.
- Fixed an issue where notification settings were not transferring to the project owner when creating a project via Zapier.
- Resolved a bug that occasionally caused signature request notifications to send out of order when signing order was enabled on contract tasks.
- Fixed a syncing issue where clients added in Project view did not consistently appear across the bulk assignment dialog, task drawer, and Project Users page. Clients now stay fully in sync everywhere.
- When duplicating a task, client assignees are now copied over if they are still part of the project.
- Restored default task sorting by due date in the All Tasks view based on user feedback.
February 4th, 2026
- Simpler, Clearer Task Visibility: We’ve redesigned task visibility in the Task Composer to make it instantly clear who sees what. Tasks are now either Private (internal-only) or Portal (visible in the client portal and progress tracker), with flexible assignment for clients, team members, or both. This update makes task setup faster today and sets the stage for more improvements coming soon.
- Highlight What Matters with Pinned Notes: Keep important information front and center by pinning key notes to the top of the notes list in a project. Plus, when a note is updated, you’ll now see an activity event so your team never misses an important change.
- To avoid confusion, team members assigned to the contractor role no longer see the “read-only but you can add yourself to this project” badge.
- Portal previews now more accurately reflect the live experience by removing “LaunchBay” from the page title during preview.
- Contract signing notifications are now sent more intelligently to the next required signer.
- Teams with whitelabel functionality enabled—but not currently in use—can now successfully edit their custom subdomain.
January 30th, 2026
- This week’s release focuses on meaningful improvements to existing features, along with several bug fixes across the platform.
- Fixed the “View Portal” button in the Client Details sidebar so it correctly links to the project when accessed from the task modal in the Invoices view.
- To keep the task comments experience intuitive and focused, the comment visibility toggle is no longer shown for team-only tasks. With the introduction of public and private comments, this option had become redundant, so it’s been removed to simplify the interface and keep tasks action-oriented.
- Since team admins now have access to all projects across the account by default, they are no longer automatically added to every newly created project. This prevents unnecessary notifications while maintaining full project visibility for admins.
- Improved exporting of feedback annotations for tasks with many attached files, resolving an issue that could cause exports to time out.
January 21st, 2026
- Improved User Management Design: We’ve refreshed the design of the Users page across projects and templates, as well as the Team page in Settings. The updated layout is more modern and intuitive, making it easier to add and manage users.
- Added direct links to projects from the task modal in the Invoices view, making it faster to get the right context when reviewing an invoice.
- Fixed an issue where duplicating a completed task with subtasks would incorrectly mark the duplicated task as completed.
- Removed the visibility toggle on team tasks that allowed comments to be switched between client-visible and team-only, simplifying comment behavior and reducing confusion.
January 14th, 2026
- Companies in the Projects Dashboard: The Clients column in the Projects Dashboard now displays the company associated with each project. This makes it easier to understand which work belongs to which company at a glance and adds more day-to-day value to Companies overall.
- View & Edit Companies from the Projects Dashboard: Clicking a company name in the Clients column now opens a slide-out panel where you can view and edit the company’s people and projects, without leaving the Projects Dashboard.
- Fixed an issue where the favorite button in the Projects Dashboard behaved incorrectly when no projects were favorited
- Resolved a bug that prevented AI clients from submitting forms that include field groups
- Removed duplicate template copies from appearing in the Project Progress Report
- Improved Message Center search so queries now match against the project associated with each message
- Increased the maximum dimensions for video proofs so large video files display more clearly
January 7th, 2026
- Task Tags: You can now create Task Tags in your account settings and apply them to any task across LaunchBay. In addition to unlocking powerful new options for automating and streamlining workflows, Task Tags make it faster and easier to surface specific types of work by filtering tasks by tag in the All Tasks view and on the Tasks page within individual projects.
- Trigger Automations Using Task Tags: You can now trigger automations whenever a specific Task Tag is added or removed. This allows workflows to automatically activate tasks or stages, send notifications, and kick off other downstream actions based on how work is progressing.
- Auto-Assign Tasks Using Tags: Within the settings for your projects and templates, you can now specify a team member or client added to that project or template to be automatically assigned whenever the tag is applied to a task. Task Tag Assignments are available on the LaunchBay Scale plan.
- Projects Dashboard Enhancements: The Projects Dashboard has been updated with a more intuitive UI and is now called All Projects. In this view, you can now filter projects by template, making it faster to navigate different types of work and maintain clarity as project volume grows.
- Team admins can now view all projects in the dashboard as read-only, even if they are not assigned to the project.
- Unsaved invoices can be removed from tasks.
- Reminder digests no longer group tasks from multiple projects into a single email.
- Fixed an issue where the audio button was not appearing in forms.
December 17th, 2025
- Stage Forecasts: See how long work typically takes at each stage and compare active projects against historical performance. In Project Progress Reporting, projects are now flagged as On Track or Behind, making it easy to spot where attention is needed.
- Improved AI Form Builder: The AI Form Builder now supports additional form elements like headlines and descriptions, optional fields, and smarter usage of each field type for better form generation.
- Form Builder UI & UX Enhancements: Improved styling and usability when editing forms for a cleaner, more intuitive experience.
- We now add the PDF extension to saved contracts so you can view and download them reliably as PDFs.
December 11th, 2025
- Project Progress Reporting: From the Project Progress tab within the Reporting page, you can now view all projects created from a specific template. This provides a spreadsheet-style matrix showing the status of every task across all related projects—making it easier to understand overall progress and quickly identify bottlenecks for each project type.
- Add Multiple Clients via the “Create Project” Zapier Action: The LaunchBay Create Project Zapier action now supports adding multiple clients when creating a new project, making automated workflows more flexible.
- Easier Stage Deletion: You no longer need to manually delete all tasks within a stage before removing it. Stages can now be deleted directly—both in active projects and in templates—simply by selecting Delete from the stage actions dropdown.
- File Preview from Sidebar: You can now click a file’s thumbnail or icon from the file details sidebar to instantly open a preview.
- Resolved issues with form field groups, including reorder jumpiness when multiple groups are present. Added improvements to ensure that inserting a new field between groups places it in the correct position.
- Fixed an issue where multiple signer fields couldn’t be saved or reloaded across several contracts within a single template task.
- Resolved a bug that caused duplicate project owners when creating a project from a template via Zapier.
- You can now successfully update a project’s status from its Settings page.
December 3rd, 2025
- Native Invoicing: You can now send invoices, accept payments, and manage your services and pricing—without leaving LaunchBay. Once you connect your Stripe account, invoicing becomes part of your workflow: attach an invoice to any task and your client can review and pay as they complete it. No extra emails, no payment links to chase, and no awkward follow-ups.
- Message Center Enhancements: Quickly surface messages that need attention with the new Unassigned tab (to find messages that still need an owner), the Not replied to filter (to spot conversations awaiting a response), and improved sorting so you can prioritize messages where a client or teammate was @mentioned.
- Improved Time Tracking UI for a smoother experience, including better mobile responsiveness.
- Fixed an issue that could occasionally prevent a company from being created and associated when adding a new client.
- Improved project stage import automations so task references within imported template stages correctly map to the newly imported tasks.
November 19th, 2025
- This week’s release focuses on small but meaningful improvements across the platform while our team continues work on one of the most ambitious (and highly requested) features we’ve ever built. More details coming very soon!
- Time Tracking is now active for all Grow plan users. Previously, it was only accessible on the Scale plan—but no upgrade is required. If you’re currently subscribed to the Grow plan, Time Tracking is now live in your account.
- Resolved an issue where task due dates would occasionally appear overlapped on the project calendar. Task due dates are now consistently converted and displayed in the correct timezone.
- To prevent confusion between standard file attachments and proofing files, the “V1” label has been removed from attachments in the task composer.
- Hovering over the “Export Form Submissions” button now displays the number of completed submissions available for download. Previously, the preview count included autosaved (but incomplete) submissions, causing a mismatch between the preview count and the exported file.
November 12th, 2025
- Improved conditional logic for form fields: when setting up form field conditional logic, if the selected conditioned-on field is a dropdown, checkboxes, or radio buttons, we now give you a select box for the value instead of having to type the value in manually.
- When duplicating a proof task, threaded comments are now properly copied over exactly as they appeared on the original task.
- AI Navigator now works across all pages of individual projects, not just the Tasks page.
- To ensure more predictable automation behavior, automations configured to activate a task can no longer re-activate tasks that have already been completed.
- When a task is moved out of a stage, its status is now automatically updated to Draft to avoid potentially missed tasks or client confusion.
- To avoid confusion about whether tasks were assigned manually by a specific person or via an automation, we no longer include the project owner’s name in the subject line of task assignment notification emails.
- Notification emails have been enhanced to dynamically adjust based on the recipient’s role in the project (for example, a team member’s permission level or whether a client has full or guest access), ensuring the information provided is as clear and relevant as possible.
November 6th, 2025
- Proof Versioning: When clients request changes to an image, video, PDF, or other file shared in a proofing task, you can now edit the task and click “Add new version” to upload V2, V3, and beyond. This update streamlines the review process, provides clear visibility into revisions, and helps clients and team members track progress toward final approval. Proof versioning is available for all Grow and Scale plan users.
- AI Navigator: The new AI Navigator (available for teams on the Scale plan) is an AI-powered assistant that helps you manage projects more efficiently. It can summarize project status, recommend next actions, and provide intelligent insights based on your project data.
- When creating a meeting summary via Zapier, the project owner (instead of the team owner) now receives the notification.
- Fixed an issue where project owners were not being automatically assigned when creating projects from templates via Zapier.
- Ensured all projects include at least one Tasks tab by default.
- When a task is moved out of a stage, its status is now automatically updated to Draft to avoid potentially missed tasks or client confusion.
October 29th, 2025
- PDF Annotation Improvements: You can now annotate multi-page PDFs directly within LaunchBay, streamlining document collaboration and review.
- Improved Client Portal Navigation: You can now use your browser’s back and forward buttons to move through the client portal, and refreshing the page will keep you exactlywhere you left off—making navigation smoother and more intuitive. Each Client Portal page also has a unique URL, so you can now link to it in tasks.
- AI Task Builder Upgrade: The AI Task Builder is now more intuitive to the prompts you provide, making it even easier to generate accurate stages and tasks automatically.
- Improved Sidebar Navigation: Updated sidebar navigation with clearer grouping of related pages, making it easier to find what you need and manage your work efficiently.
- Message Center Enhancements: The Message Center now includes an “Open Task” button that launches the full task modal, replacing the previous dropdown interaction. Team members can log time directly from Message Center, and file annotation comments are now visible within message threads for better context.
- Resolved an error that displayed the wrong yearwhen adding a user to a project
- New clients added in the task editor now appear immediately in the project list and can be assigned tasks without needing to refresh the page.
- Fixed an issue where deleting a file from one task also removed it from its duplicate
October 22nd, 2025
- Repeatable Form Field Groups: You can now create repeating groups of related form fields to collect multiple instances of the same data type. For example, instead of adding five separate “Owner” sections to your form, you can create one “Owner” field group containing fields like name, email, and phone number. Clients can then add as many owners as needed using this single, repeatable field group.
- Better Visibility for Embedded Content in Tasks: When you use the Embed task option to include external apps or websites, the embedded content will now appear at the top of the task—above proofs, forms, and other attachments. This makes it easier for clients to view important embedded materials, such as walkthrough videos, before completing the rest of the task.
- Added a banner to clearly indicate when impersonating a client in the portal (read-only mode).
- Fixed an issue where messages created by you weren’t appearing in the Assigned tab within Message Center.
- Fixed an occasional crash that occurred when exporting task annotations.
October 16th, 2025
- Project Health Scores: Projects now display a health score based on task completion, engagement, and overall activity—helping your team quickly identify at-risk projects and prioritize accordingly. Health scores appear to the right of each project name in the Projects Dashboard, and you can view a detailed breakdown of a project’s score on its Home page.
- Emoji Reactions for Activities and Comments: Team members and clients can now add emoji reactions to any activity or comment, making collaboration on tasks and project updates more expressive and engaging.
- Emoji Support in Stages and Comments: When creating stages in active projects or templates, you can now include emojis directly in stage names. In addition, both clients and team members can add emojis within task comments, bringing more personality and clarity to communication throughout your projects.
- Adjusted project list layout to use full width when no filters are applied.
- Fixed an issue where deleted completed contracts were still visible in the task modal.
- Resolved an issue preventing the “View Portal” button from working in the Client Directory.
- Added “On Hold” projects to the Motion Chat creation dropdown.
- Chat messages are now included in client digest emails.
October 9th, 2025
- Portal Guest Role: Perfect for clients with limited involvement in a project. Guest users can access their portal and complete assigned tasks without visibility into the full project. They’ll only have access to their own tasks and uploaded files, keeping project chats, other tasks, and sensitive details private. Guest Roles are available to all users on the Scale plan.
- Enhanced Portal Preview: The new Preview Portal dropdown lets you select any client added to a project and instantly view the portal from their perspective.
- Improved Portal Login Tracking: In addition to project owners receiving email notifications when clients first access a project from their portal, all team members can now view when clients accept invites and log in for the first time. These updates are displayed directly in your project’s Activity Feed for improved visibility.
- We re-added the image annotation toggle in proofing tasks, allowing users to enable or disable visual feedback when reviewing proofs.
- Messages in the Message Center now correctly restore to the last visited tab when the page reloads.
- In the client portal, alerts will no longer appear for assigned tasks that belong to completed projects.
- We’ve updated LaunchBay’s “File Upload” Zapier trigger to include completed contracts in addition to other file uploads, enabling automated workflows that send finalized contracts to tools like Google Drive, Box, and other connected platforms.
October 1st, 2025
- Meeting Notes with AI Summaries: You can now add meeting notes directly to projects and instantly generate AI-powered summaries to keep your team and clients aligned.
- Zapier "Create Meeting" Action: A new Zapier action, Create Meeting, allows you to connect tools like Fathom and automatically add meetings to your Motion projects.
- Team chat messages in the Message Center now display correctly in the Sent tab
- When copying a task from a template to a project, if the template’s assigned reviewer isn’t part of the destination project, the reviewer will now automatically default to the project owner.
- Project fields in team tasks and client portal views are now correctly replaced with project-specific values.
- The Upload Contract button now works properly when editing an existing contract.
September 24th, 2025
- Team Assignments in Message Center: Assign, unassign, and reassign team members to specific client messages—making it crystal clear who’s responsible for what.
- New "Assigned to Me" & "Sent" Tabs: Give your team instant visibility into which conversations need a response and which have already been handled. The new Assigned to Me tab shows all conversations a team member has been assigned to, while the Sent tab lets them quickly see recently responded-to comments and chats in the LaunchBay Message Center.
- Portal Login Confirmation Emails: Project owners now get notified the moment clients from their projects log into their portal for the first time—eliminating back-and-forth about access.
- Added team-only tag in email notifications for private comments to clearly distinguish between client-facing and internal messages.
- Increased the character limit before truncation in automation dropdowns (tasks, stages, and templates).
- Improved AI form builder with auto-resizing text areas for prompts.
- Fixed an issue preventing the full task activity feed from displaying correctly.
September 17th, 2025
- Time Tracking: Track time and expenses directly in LaunchBay without juggling multiple tools. Create categories with different billing rates for your services, and let your team log billable hours on a task-by-task basis. Access detailed time tracking reports anytime from your account settings.
- Private & Public Comments: Add private team-only notes or tagged messages directly on client tasks, alongside client-facing threads. Keep context tied to the right task, avoid side channels like email or Slack, and ensure clients only see what’s meant for them.
- Team Comment Notifications: Whenever your team leaves a public comment on a task, the assigned client(s) will receive a notification directly in their LaunchBay portal.
- Improved styling for comments across the app. Comment text boxes now expand automatically as you type more lines.
- Pressing "Enter" when adding a checklist item to a task now creates the next blank checklist item automatically.
- Reworked the interface for proofing tasks so files sent for feedback and approval have a sleeker, easier-to-use UX.
- Fixed a bug that prevented portal forms from showing the first time you navigated to the tab.
September 10th, 2025
- Easier Avatar Customization for Clients: When clients first access their portal, a banner at the top of the "Home" page prompts them to set an avatar. They can either choose an emoji or upload their own profile picture for a more personalized experience.
- Auto-Generated Avatar Color Palettes: If no avatar is set, LaunchBay will now generate one automatically by pulling colors from your team’s primary palette. This ensures a consistent, polished look across your workspace.
- Support for Contracts Without a Client Role: Contracts can now be created and managed without requiring a client role, giving teams greater flexibility in structuring agreements.
- Fixed formatting issues with automation actions.
- Corrected comment ordering in the message center so messages display from oldest to newest.
- Resolved rendering issues in digest emails to ensure team tasks and chats display correctly and links redirect to the proper places.
- Fixed permissions issue when propagating tab changes from templates to projects, ensuring users without edit permissions on a project cannot bypass restrictions.
- Updating a template task’s due date now dynamically updates it in the task listing.
- Increased resolution of client portal banner images for sharper display.
- Fixed issue preventing task links from being opened from the activity sidebar.
September 3rd, 2025
- Preview activities in digest emails: Users will now see a preview of activities directly within digest emails.
- Removed the max height of the iframe container on mobile.
- Stages now dynamically update after building tasks with AI without requiring a page reload.
- Long task titles in the calendar view are now truncated for better readability.
- Portal page forms with conditional inputs now save correctly.
- Files can now be deleted from the file sidebar.
- Assigning yourself to a task will no longer trigger an assignment email.
- Client portal invites are now recorded in email history.
August 27th, 2025
- Calendar View for Tasks: In addition to the list view and filters already available on the Tasks page, you can now see tasks in a calendar layout, organized by due date for easier planning and scheduling.
- AI Stage Builder: The new AI Stage Builder makes it simple to update project templates or launch projects on the fly. Just describe a stage, and LaunchBay will instantly generate all the necessary tasks with the right options applied — even creating and attaching forms linked to those tasks.
- Custom Signing Order for Contracts: When creating either a contract template or a single-use contract, you can now specify the signing order for each party. This replaces the previous requirement where clients were always required to sign first.
- Zapier Trigger for Client Requests: You can now use Client Request forms embedded in portal tabs as triggers in Zapier. This update to our existing Form Submission trigger makes it easy to automate workflows — for example, automatically creating a new project in LaunchBay whenever a Client Request form is submitted.
- Share Project Progress Tracker Updates: Easily share the status of a project outside of LaunchBay by copying its progress tracker — complete with emojis representing the current state of each task — and pasting it into emails, reports, or any other tool your team uses for updates.
- You can now rename the "Uncategorized" stage and drag it to any position within your project.
- Fixed a bug where required but conditionally hidden text areas prevented forms from submitting.
- Fixed an issue where team BCC recipients were accidentally removed from portal invite emails.
- Client responses to “Task Completed” and “Changes Requested” emails are now automatically routed to the Message Center, thanks to the addition of the reply-to email address.
August 20th, 2025
- New Recurring Task Options: You can now set custom intervals (in weeks or months) for recurring tasks, making it easy to schedule biweekly, quarterly, or other flexible recurrence patterns.
- Streamlined Conditional Logic in Forms: When configuring conditional logic, you can now quickly search for form fields instead of scrolling through long lists.
- New Automation Option: The new “Activate task on import” setting makes tasks imported through automation instantly available for team members or clients to complete.
- Archived tasks are now hidden by default in a project’s list view, keeping your workspace focused on active work.
- Fixed an issue that prevented assigning a team member as the project owner when creating a project from a template.
- Task and stage order is now preserved when duplicating projects.
- Project fields can now accept
0as a valid value, whether entered manually or via form submission.
August 13th, 2025
- More Powerful Stage Imports: You can now import entire stages with their existing automations—whether done manually or via an automation action—and even trigger new automation actions when a stage is imported into a project.
- Progress Tracker Subscription Notifications: Clients can now subscribe to progress tracker updates to receive immediate notifications when tasks or stages are completed.
- On Hold Project Status: Introduced a new On Hold status for projects, which keeps them accessible but pauses reminder emails and portal notifications.
- Faster, More Reliable CSV Imports: We’ve significantly improved CSV import performance, allowing large lists of projects and clients to be imported without timing out, ensuring all projects are created as expected.
- Task titles are now included when matching results in the Message Center search.
- Fixed an issue preventing tasks with multiple proof files from exporting correctly.
- Default project fields now appear on each project’s Fields page for easier visibility and management.
- When the “activate stage” automation fires, completed tasks in that stage are no longer reactivated.
- Projects can now be deleted directly from the Projects dashboard.
August 6th, 2025
- Enhanced Project Progress Tracker: We've redesigned the Project Progress Tracker to make it more intuitive and informative for your clients. The new version features a cleaner, more modern design with clear task markers and a visible progress bar to help clients quickly understand where they are in the process.
- Fixed an issue preventing edits to client details from the Client Directory’s profile sidebar.
- Resolved a bug that blocked task assignment emails from sending when the task was created by a former team member.
- Fixed a problem where newly created contract templates appeared to save successfully but would revert to a “No fields added” state after refreshing the page.
July 31st, 2025
- Message Center Improvements: We’ve redesigned the Message Center with a cleaner layout and powerful new capabilities. You can now search messages by client or project, filter by read/unread status, see per-user read statuses, and take bulk actions with ease.
- Global Template Update Enhancements: You can now edit portal pages within a template and propagate those changes to all associated child projects—making template management faster and more consistent.
- Fixed an issue where newly added portal pages to a template weren’t copying settings to child projects when "Apply to Children" was selected.
- Resolved a bug that prevented contract tasks from being marked complete, even after all signatures were collected.
- In the Zapier "Tag Added" trigger, we now break out project users by role—enabling more flexible and reliable mapping to third-party tools.
July 23rd, 2025
- Favorites in Projects Dashboard: You can now favorite projects directly from the Projects Dashboard. Favorited projects appear at the top of your list, making it easier to quickly access high-priority work.
- Saved Filters in Projects Dashboard: Filters, pagination, and search state are now preserved—no more resets on refresh.
- Filter By Client in Projects Dashboard: Client avatars now appear in the Projects Dashboard, making it easier to visually identify clients associated with projects. You can click a client avatar, search by client name, or use the Message Center to filter and view projects tied to a specific client.
- Project Owner Field in Tasks & Portal Tabs: You can now reference the Project Owner in task descriptions and portal tabs using the {{PROJECT_OWNER}} field. This makes it easier to personalize tasks and client-facing content while minimizing setup.
- Auto-Assign Tasks to Project Owner: Team Tasks in templates can now be automatically assigned to the Project Owner when a project is created from a template.
- Team comments on tasks are now visible in the Message Center.
- Files can now be properly sorted when using filters or search.
- Exporting annotations on team tasks now works correctly.
- On mobile, comments now default to a closed state to reduce screen clutter and improve readability.
July 16th, 2025
- Productivity Reporting: Teams on the Scale plan now have access to the new Reporting tab, highlighting key metrics—such as tasks completed, automation runs, emails eliminated, and estimated hours and dollars saved—to help quantify LaunchBay’s impact across your team.
- Single-Use Contracts: In addition to setting up reusable contract templates from the Contracts tab in your account sidebar, you can now create single-use contracts directly from the task composer.
- Resolved a scrolling issue on the project progress tracker in the client portal homepage, allowing clients to scroll through all project stages, even in projects with many stages.
- Fixed an issue where tasks not assigned to a stage could not be saved from the project tasks board view.
- Restored the visual indicator in the task activity sidebar showing when an AI client is actively working on a task.
July 9th, 2025
- Portal Forms: Within Project Tabs of your LaunchBay projects and project templates, you can now embed custom Portal Forms that appear directly in your clients’ portals. Clients can submit these forms at any time, and each submission will automatically create a task assigned to you or a team member for follow-up. Learn more about Portal Forms ›
- Task Activity Feed: To give your team and clients better visibility into what’s happening in a task, the right sidebar in tasks now includes a detailed activity feed. In addition to comments, this sidebar now shows when individuals were added to the task, and any changes to the task’s status and timing.
- Fixed a bug that occasionally caused the due date for tasks with checklists to not save correctly.
- Fixed an issue where global template updates led to inconsistent ordering of project tabs when a project tab update was applied globally.
June 25th, 2025
- Enhanced Clarity for Project Tags: Tags on the Projects Dashboard now dynamically adjust to fit your screen size. This ensures that the maximum number of tags are displayed at a glance—no extra clicks required.
- Folder Downloads in Files Manager: File folders can now be downloaded directly from the Files Manager—available to both Admins and Clients.
- Easier Activation of Draft Tasks: Tasks in draft mode now display an “Activate Task” button instead of “Mark Task Completed” in the task modal—eliminating confusion and making it easier to send tasks directly from the preview.
- If a team member is deleted and they were the sole user on a project, we’ll now automatically assign the account Administrator to them in order to prevent orphaned projects.
- Document templates once again correctly auto-assign Client Fields to the first client assignee on a task.
- Fixed mobile sidebar scrolling when a client has many projects.
- Improved rendering of the Client Portal on mobile devices for better usability.
- Resolved an issue that blocked image loading for users in the Philippines.
June 19th, 2025
- AI Clients: You can now add simulated clients to any project to test your workflows and experience them from a client’s perspective. AI Clients will complete assigned tasks, leave comments, and generate time-based insights to help identify opportunities to improve, automate, or refine your templates. Learn more about using AI Clients ›
- Portal Notifications for New Messages: Clients now see visual notification badges in their portals for new messages—just like LaunchBay team members do in the admin dashboard. This keeps communication clear and ensures clients never miss an important update.
- Major Enhancements to Mobile: We’ve rolled out extensive updates to how LaunchBay works on mobile, refining dozens of features to ensure a smooth, consistent experience across devices for both clients and team members.
- Fixed an issue where checklists couldn’t be removed from tasks they were previously added to.
- Resolved a bug that prevented contract tasks from activating as expected.
- Added support for Atlantic, Alaska, and Australian Western time zones in the Branding tab of account settings.
- Fixed an issue where custom fields didn’t populate correctly in task descriptions.
- Resolved a scenario where newly created tasks were re-ordered unexpectedly after a page refresh.
- Improved how custom field data is formatted in LaunchBay’s "Create Project" Zapier action, allowing it to be mapped to subsequent Zap steps as expected.
June 11th, 2025
- Easier Project Template Deletion: You can now quickly delete project templates using the new Delete option in the triple-dot menu on the Template Library page.
- Fixed a server error that occurred when activating a large number of tasks simultaneously.
- Resolved an issue where submitting answers that exceeded a very high character limit for custom field-linked form questions caused a server error.
- Stages created during the onboarding flow now maintain a consistent and stable order.
- Clients are no longer discouraged from completing a task just because they didn’t approve every file. A warning modal is now only shown if a client has neither approved nor requested changes for all proof-required files.
June 5th, 2025
- New & Improved File Management: We’ve completely redesigned how file management works in LaunchBay—making it feel more familiar and intuitive, just like the tools you already use. You can now rename files, create sub-folders, upload directly into folders, filter by file type, and easily share any file or folder with clients via the portal.
- Mobile Interface Improvements: LaunchBay now runs smoother and faster on mobile, offering an improved experience for team members accessing projects on the go.
- Fixed an issue where the "Create Project" button in the Templates Library was unresponsive or not functioning as intended.
May 21st, 2025
- Populate Custom Fields Multiple Times in the Same Contract: You can now populate the same custom field value in multiple places within a single contract. Learn more ›
- Weekly Recurring Tasks: In addition to the existing monthly recurring tasks option, you can now set tasks to repeat weekly—on the day of the week you choose.
- Custom Names for Automations: Give each automation in a project a custom name using your internal language. This makes it easier to understand what each automation does at a glance—no guessing required.
- Redesigned Automations Page: We’ve overhauled the Automations page to improve clarity and usability, making it easier for your team to quickly understand what each automation does and when it last ran. Learn more ›
- Fixed an issue where deleting the “Tasks” tab from a project made it impossible to re-add. This tab is now protected and cannot be removed.
- To prevent team members from messaging clients who can’t see the message, chat functionality is now hidden in both the project view and message center when the “Messages” page is removed from client portals.
- Notifications for new client chat messages now automatically clear once the client views the messages in their portal.
- Resolved an issue that prevented annotations from exporting when multiple reviewed files were included in a single proofing task.
May 13th, 2025
- New Roles and Permissions: You can now assign one of four distinct roles when inviting team members to LaunchBay: Administrator, Manager, Employee, and Contractor. Each role comes with tailored permissions to fit your team's needs. Learn more about each role ›
- Customize Portal Header Images: You can now upload a custom header image from your Settings page to further personalize the look and feel of your client portals. Once uploaded, the image will automatically appear across all portals.
- New Zapier Trigger – “Tag Added”: Create powerful automations by triggering workflows whenever a tag is added to a LaunchBay project. Use it to send updates to your CRM, kick off tasks in other tools your business uses, and much more.
- Clients who click the call-to-action in welcome emails will now land directly on the Home page of their portal as expected.
- Resolved an issue where bulk assigning tasks in the List view did not work as expected.
- Fixed an issue where project tabs were not displaying in the correct order after being rearranged in the portal editor.
May 1st, 2025
- New “Tasks” View: The “My Tasks” tab is now simply “Tasks”—a centralized view showing all tasks across all projects. Filter by due date, assignee, and more for full visibility and control.
- Streamlined Task Assigning: When you create a new project, you'll now have the option to assign all its tasks to the first client you add.
- Task Visibility Improvements: On the "Tasks" page of your projects, a new column in the list view titled "Portal" helps your team quickly understand what Tasks are visible to clients in their portal and why or why not they are shown.
- Fixed an issue that prevented the AI Task Builder being accessible in certain projects.
- Performance improvement to make Forms with a significant number of blocks/fields load faster.
- Update to prevent tasks not shown in Client Portals being included in client digest emails.
April 23rd, 2025
- Rename Portal Pages: Easily rename the Files, Helpdesk, and Messages pages from your account settings
- Task Context in Message Center: Client messages you generate tasks from now include a link to task details.
- Enhanced Message Center Task Creation: Use the full task composer when creating tasks in the Message Center.
- Custom fields will not save without a slug assigned.
- Request changes button is present when viewing a task via the project activity bell.
- “View All” activity button the the project homepages is fully functional.
April 15th, 2025
- New Task Filters: You can now filter project tasks by stage, assignee, due date, and latest comments.
- Simplified Form Creation: When building LaunchBay forms, you can more easily add elements anywhere within the form.
- Highlight Required Form Fields: Clients will now see a more prominent notification if they miss required fields on a form.
- Project Names in Form Exports: Bulk exports of responses to a specific form now include the project name associated with each entry.
- Activity Notifications: We’ve added an activity bell icon for notifications in the corner of all project pages.
- Admins will no longer receive email notifications for their own in-app updates
- The “Visit Task” button in the message center will now direct you to that specific task in the board view
- Client email notifications to “View Task” now direct them to the Tasks page and not the Welcome page
- We’ve improved the auto-saving functionality of LaunchBay forms for a more consistent experience
April 9th, 2025
- Custom Portal Pages Added to Client’s Portal Sidebar: Now clients can find their Custom Portal Pages an additional way: within the Project section of their Portal’s sidebar.
- Improved Stage Design: When viewing your Projects in List View, Stages now have a sleeker, more separated look.
- Redesigned Menu in Project Pages: No more drop-down menus on Project-Related pages; now the menu is cleaner and easier to navigate.
- Fixed a “Resource not found” error when selecting project chats in the message center
- All tasks types will be able to save properly
April 2nd, 2025
- New Client Portal Design: Client portals have received a major upgrade—featuring a refreshed design and a brand-new homepage and are now organized by client instead of by project.
- Kanban Project Management: The new Board View introduces a visual, Kanban-style layout where tasks are organized into columns based on their status. You can drag and drop tasks between columns to instantly update their status—making it easier than ever to manage project workflows at a glance.
- Create Tasks From Client Messages: From the Message Center, you can now instantly convert client chats and task comments into internal tasks.
- In addition to the new features detailed above, this release also includes several minor bug fixes and performance upgrades to ensure the LaunchBay platform runs smoothly for all users.
March 12th, 2025
- New Team Review Option for Internal Tasks: We’ve now added the option to add a required review to team tasks. This allows you to have someone from the team double-check an internal completed task.
- Fixed the inability to delete a checklist item when editing a task that has already been saved.
- Team members can preview project tabs within the new portal.
- Resolved a bug that prevented the system from properly turning on “require review” on tasks.
- Messages can be unflagged in the message center.
March 5th, 2025
- Improved & Redesigned Task Composer: We’ve completely redesigned LaunchBay's task composer to make creating both client and internal tasks faster, smoother, and more intuitive.
- Checklist Option for Tasks: Checklists can now be added to both client and internal tasks, helping you break larger tasks into smaller, actionable steps.
- Toggle Between Client and Internal Tasks: You can now easily toggle between creating client and internal tasks before or after saving.
- Client Email Reply Logging: Replies to LaunchBay notification emails are now automatically logged in the Message Center. This applies to client and team replies to chat message notifications, notifications and reminders for individual tasks, and daily digest emails
- Automated task reminders will no longer be sent for tasks that have been set to the “Archived” status.
- Client annotations on file approval and feedback tasks with multiple images will now display correctly on the corresponding images.


Get back to the work you're best at.
LaunchBay's AI-powered client portal handles the collecting, reminding, and following up, so your team spends less time chasing clients and more time delivering.
Ready to stop chasing?

